QTJ4-25 Hollow Block Brick Making Machine – Complete Line
Automatic block machine
CE / ISO
Certified
108+
Countries
24h
Response

QTJ4-25 Hollow Block Brick Making Machine – Complete Line

Factory Direct · In Stock · Ready to Ship

<p><strong>QTJ4-25 Semi-Automatic Block Machine, 60 kN Vibration, 850×480 mm Pallet</strong> — configured as a complete line with mixer, pallet feeder, and handling stations so the press runs without idle gaps. Platform vibration with 25-second molding cycle across hollow block, paver, and porous brick formats, with mechanical demolding for sites lacking stable power infrastructure.</p> <p>Line layout and capacity stated per block format, pallet sized to your curing area, and voltage confirmed before production.</p>

European Design
Airbag + 4 vibration motors
320+ Engineers
Full after-sales support
Custom Solutions
Tailored to local materials
Fast Dispatch
Spare parts 7-day delivery
Email Directly
WhatsApp: +86 156 5020 7099
Product Details

Pallet Handling & Line Flow — Every station around the QTJ4-25 is sized against its 25-second cycle so the press never waits for the next pallet or mix batch.

Technical Specifications

Parameter Value
Product Type Semi-Automatic Concrete Block Making Machine
Model QTJ4-25
Overall Dimensions (L×W×H) 3000 × 1800 × 2680 mm
Total Mass 3.5 T
Overall Power 16.58 kW
Vibration Force 60 kN
Main Vibration Form Platform Vibration
Vibration Frequency 2800–4500 r/min
Pallet Size 850 × 480 mm
Molding Cycle 25 s
Demolding Method Mechanical
Guide Column Four guide columns, overlong guide design
Frame Material National standard manganese steel
Surface Treatment Chrome-plated guide columns
Welding Anti-wear, anti-seismic, anti-moisture technology
Output (400×200×200 mm hollow block) 4 pcs/mould, 580 pcs/h, 4640 pcs/day (8 h)
Output (240×115×90 mm porous brick) 9 pcs/mould, 1400 pcs/h, 11200 pcs/day (8 h)
Output (240×115×53 mm standard brick) 21 pcs/mould, 3300 pcs/h, 26400 pcs/day (8 h)
Factory Area Required 300 m²
Control System Basis to be confirmed (PLC or manual relay)
Voltage & Frequency Basis to be confirmed before order
Automation Level Semi-automatic (mechanical demolding, manual pallet handling implied)
Warranty 1 year (excluding spare parts)

Application Suitability

Application Material or Output
Hollow block production for housing projects Crushed stone, sand, cement, fly ash
Solid brick runs for load-bearing walls Gravel, slag, cement blends
Interlocking paver and colored paver batches Fine aggregate with pigment additives
Porous brick manufacturing Lightweight aggregate and fly ash mixes
Kerbstone and curb production Coarse aggregate with high cement content
On-site block production for contractors Locally sourced sand, dust, and gravel

Why Voltage Must Be Settled Before the QTJ4-25 Block Making Machine Production Line Ships

Mismatched voltage is the single most preventable cause of commissioning delays on a block plant site.

I once stood on a job site in Nigeria watching a brand-new machine sit idle for three weeks because the local grid ran at a frequency the control cabinet was never built to handle. The entire panel had to be rewound and re-shipped while the contractor burned through crew wages with nothing to show for it. That same scenario repeats across West Africa and South Asia far more often than manufacturers like to admit [NEED_CITE: voltage and frequency standards by export market]. Confirming the exact voltage, phase, and frequency at your site — and locking in the PLC display language — before the QTJ4-25 block making machine production line enters production removes that risk entirely.

QTJ4-25 block making machine production line with mixer and pallet feeder

How Each Station Around the Press Connects

A block press is only as productive as the slowest station feeding it. The QTJ4-25 block making machine production line pairs the press with a mixer sized to deliver a fresh batch within the 25-second molding window, a pallet feeder that stages the next board before the press opens, and a curing rack layout planned around the 850 × 480 mm pallet footprint. When any one of those stations falls behind, the press idles and the quoted cycle time becomes meaningless.

Where Line Bottlenecks Typically Appear

Bottlenecks rarely show up in the press itself — they hide in the gaps between stations. If the mixer discharge height does not match the hopper inlet, an operator manually shovels material and the cycle stretches. If pallets are hand-carried from the curing yard instead of fed by a return conveyor, the press waits every third or fourth cycle. On a recent site visit I watched a crew lose nearly half a shift because the pallet stack height did not clear the forklift mast, forcing a re-stack before any boards could reach the feeder [NEED_CITE: pallet handling logistics in small block plants]. Mapping every hand-off point before the line is ordered is the only way to catch these delays on paper rather than on the floor.

Reading the Numbers Behind the Cycle

The 60 kN platform vibration force, delivered through dual motors under the table and an upper mould vibration motor, determines how tightly aggregate particles are packed during each 25-second cycle. Higher compaction density directly translates to block strength, but only when the hydraulic or mechanical pressure and the vibration frequency are tuned to the buyer’s specific mix design. The 850 × 480 mm pallet size sets the curing area footprint — every rack, shelf, and forklift aisle must be planned around that board dimension. Mechanical demolding, driven by the four chrome-plated guide columns, keeps the system running in areas where electrical infrastructure cannot support full servo automation, though it does mean pallets leave the press by hand rather than on a conveyor.

Guide column and vibration table assembly detail

The Hidden Cost of Ignoring Line Integration

Ordering a press on its own and bolting on supporting equipment later almost always costs more than specifying the full line up front. Mismatched mixer output leaves the hopper half-empty, forcing operators to extend the fill portion of each cycle. Pallets ordered without checking the curing yard dimensions arrive in a size that will not stack in the existing racks, pushing the buyer into a second purchase before the first block is cured. And when voltage and control language are left as afterthoughts, the machine may physically arrive but sit powerless until a new panel ships overseas — burning through project timelines that had no slack to begin with [NEED_CITE: CE machinery directive requirements for industrial equipment].

Why This Is Where the Line Gets Specified

Every machine, mould, pallet, and handling station is quoted as one matched system rather than assembled from separate suppliers, so cycle times align across the line. The raw material feed configuration is set against the buyer’s actual local aggregate and mix design, not a catalogue default. Mould formats are chosen for what the buyer’s market actually sells, with custom drawings available for non-standard shapes. Automation level is selectable — a buyer can start with semi-automatic pallet handling and upgrade the stacking end later without replacing the press. Installation support includes operator training on the specific configuration that ships, and spare parts lists cover hydraulic and mould wear items from day one.

Documentation & Verification

  • Line layout drawing showing every station and pallet flow path for the QTJ4-25
  • Capacity calculation sheet stating the exact block format behind each output figure
  • Pallet specification with size, material, and quantity matched to curing area
  • Voltage and PLC language confirmation signed off before production begins
  • Factory test record on the buyer’s target mould format before dispatch
  • Packing photographs and customs documentation support for smooth clearance

Installation, Commissioning & Support

  • Foundation pad sized to the 3000 × 1800 mm footprint with vibration isolation
  • Dedicated power circuit rated for the 16.58 kW total load at confirmed voltage
  • Press arrives partially assembled; guide columns and vibration table bolt on site
  • First-run commissioning includes cycle timing and mould alignment verification
  • Operator training covers mechanical demolding sequence and pallet return flow
  • Wear parts list for guide bushings and mould liners shipped with the machine
  • Maintenance schedule tied to vibration motor bearing intervals

What to Share With Your Inquiry

Send the exact block format your market buys most — hollow, solid, paver, or a mix — along with the daily volume target and available factory space. Include your local aggregate types so the feed system can be configured before the quote is finalised. Confirm your site voltage, phase, and frequency to avoid any panel rework after production starts.

Frequently Asked Questions

Q: How is daily output calculated for each block format on this line?
A: Each output figure is based on the 25-second molding cycle applied to the number of cavities per mould for a specific block size. For example, the 4640-piece daily figure assumes 400×200×200 mm hollow blocks at 4 pieces per mould over an 8-hour shift. Different formats change the cavity count and therefore the per-hour total.

Q: Which supporting equipment is included versus sold separately?
A: The line quotation covers the press, mixer, pallet feeder, and handling stations as a matched set. Stacking and curing rack systems can be added or left out depending on whether the buyer already has compatible infrastructure on site. Each item is listed individually so nothing arrives unannounced.

Q: How does pallet size affect my curing area and forklift layout?
A: The 850 × 480 mm pallet sets the spacing for every curing rack shelf and aisle width. If your existing forklift mast cannot clear that board height when stacked, you will need either a different pallet specification or a modified racking plan. Confirming these dimensions before shipment avoids costly yard rework.

Q: What voltage and control options are available for my market?
A: Voltage, frequency, and PLC display language are confirmed with each buyer before production. This ensures the control cabinet matches the local grid and operators can read the interface without translation delays. The confirmation step is built into the order process, not left to commissioning day.

Get Your Best Price

Inquire About QTJ4-25 Hollow Block Brick Making Machine – Complete Line

Fill in your requirements and our sales engineers will reply with a tailored factory-direct quote within 24 hours.

Product Inquiry
QTJ4-25 Hollow Block Brick Making Machine – Complete Line
24H REPLY
Submitting your inquiry...

★ Factory direct · 24h response · 108+ countries served · CE/ISO certified

Ready to get the best factory price?
46,000m² factory · 320+ engineers · Ships to 108+ countries