<p><strong>QMR4-45 Mobile Block Machine, Egg Laying Type, 6 kW / Diesel Option, No Pallet Required</strong> — designed for on-site hollow block production without a fixed plant or pallet handling loop.</p> <ul> <li>Eliminates pallet feeding, return conveyor and storage from the line layout, reducing supporting equipment count</li> <li>40-45 s moulding cycle sets the pace for upstream mixer sizing and downstream ground curing area planning</li> <li>Diesel hydraulic drive decouples the press from grid power for off-grid construction sites</li> </ul> <p>Machine, mould and handling specified as one matched system, with installation support and operator training included.</p>

European Design
Airbag + 4 vibration motors
320+ Engineers
Full after-sales support
Custom Solutions
Tailored to local materials
Fast Dispatch
Spare parts 7-day delivery
Email Directly
WhatsApp: +86 156 5020 7099
Product Details

Integrated Line Design — The QMR4-45 mobile egg laying block machine is specified as the center of a matched upstream mixing and downstream curing layout, not as a standalone press.

Technical Specifications

Parameter Value
Product Type Mobile Egg Laying Block Making Machine
Model QMR4-45
Overall Dimensions (L×W×H) 2420×1320×1650 mm
Moulding Cycle 40-45 s
Pallet Requirement No pallet required (egg laying type)
Net Weight 810 kg
Rated Power 6 kW
Power Source Option Electric motor or diesel engine (6-8 HP)
Voltage & Frequency 220V or 380V (configurable to local supply)
Automation Level Semi-automatic
Hydraulic Pressure Source Diesel engine driven hydraulic system (when configured)
Output Capacity 3000 pcs/day (basis not stated in source — confirm block format and material)
Productivity — 400×200×200 mm Hollow Block 4 pcs/mould, 40-45 s cycle (basis: 8-hour shift)
Productivity — 400×150×200 mm Hollow Block 5 pcs/mould, 40-45 s cycle (basis: 8-hour shift)
Productivity — 400×120×200 mm Hollow Block 6 pcs/mould, 40-45 s cycle (basis: 8-hour shift)

Application Suitability

Application Material or Output
On-site hollow block production for building contractors Crushed stone, sand, cement, and water mix laid directly on prepared ground
Temporary housing project block supply Standard concrete mix with locally sourced aggregate, no fixed plant required
Rural and remote construction with unreliable grid power Diesel-powered operation producing hollow blocks, multicellular bricks, and paving bricks
First-time block plant with minimal capital Semi-automatic egg laying production of standard bricks and pavers without pallet infrastructure

What "3000 Blocks per Day" Actually Means on a Job Site

The quoted daily figure only holds when the mixer keeps pace, the curing ground is prepared, and the block format matches the mould installed.

I once watched a contractor in West Africa take delivery of a mobile block machine, read the capacity plate, and order raw material for a full day’s run. The mixer they had on site could not refill the hopper fast enough to match the 40-45 second moulding cycle, so the press sat idle for half of every hour. By the end of the shift, actual output was well below the nameplate number [NEED_CITE: mixer-to-press cycle matching in small-scale block production]. The QMR4-45 mobile block machine production line only delivers its stated throughput when every station upstream and downstream is planned around the same cycle time.

QMR4-45 mobile egg laying block machine operating on a prepared concrete floor at a construction site

Removing the Pallet Circuit from the Line Layout

The most visible difference when planning supporting equipment around the QMR4-45 is what is absent. There is no pallet feeding station, no pallet return conveyor, and no pallet storage rack. The egg laying block machine supporting equipment list shrinks to raw material mixing, a water supply, and a prepared ground surface for curing. For a contractor setting up a temporary production area on a job site, this means the floor space dedicated to pallet logistics disappears entirely, and the line layout reduces to a mixer feeding the press and a team moving cured blocks to a stacking zone.

Matching the Mixer to the Moulding Cycle

A 40-45 second cycle means the press demands a fresh charge of mixed material roughly eighty times per hour when running continuously. The upstream mixer must deliver a batch in that window, accounting for loading time, mixing time, and discharge into the machine hopper. If the mixer is undersized, the press operator waits between cycles and the daily total drops. This is the most common mismatch I see on mobile block machine production lines where the press was purchased first and the mixer was an afterthought [NEED_CITE: batch cycle synchronization between pan mixers and mobile block presses]. Sizing the mixer to the QMR4-45 cycle is not optional — it is the single largest factor separating a line that runs smoothly from one that stalls.

Reading the Specs That Matter for Line Planning

The 2420×1320×1650 mm overall footprint tells you the operating aisle the machine needs as it moves forward after each lay. The 810 kg net weight means it can be relocated by a standard site forklift when the production area shifts. The 6 kW rated power determines the generator rating or grid connection required — and when the diesel engine option is selected, the hydraulic system runs independently of electrical supply, which decouples the press station from site wiring constraints. The voltage specification, available as 220V or 380V, must be confirmed against the local supply before the control panel is wired at the factory; arriving with the wrong voltage configuration delays commissioning by weeks in some markets [NEED_CITE: voltage and frequency standards by export market]. Each of these parameters connects directly to how the supporting equipment around the press is specified.

Diesel engine and hydraulic pump assembly on the QMR4-45 mobile block machine

The Cost of Skipping Line Integration

When the mixer is too small or the curing area is not prepared before the machine arrives, the press sits idle or blocks are laid on uneven, un-compacted ground and crack before they reach handling strength. I have seen entire batches written off because the curing zone was a patch of soft soil that had not been leveled or covered. The downstream curing plan — ground preparation, watering schedule, and covering — is just as much a part of the line as the press itself, yet it is almost never included in a quotation. Buyers who treat the egg laying block machine supporting equipment as secondary discover the gap only after production starts [NEED_CITE: ground curing requirements for egg laying block machines in tropical climates].

Why Buyers Source the Line Through One Supplier

Block machinery is our single focus, so the QMR4-45 is specified alongside the mixer, water dosing, and curing plan as one system rather than a press shipped with a generic equipment list. We set the configuration against your actual mix design and local aggregate, not a catalogue default. Mould options for hollow block, paving brick, and standard brick formats are confirmed before production so the press arrives ready for the products your market sells. The automation level is selectable — the semi-automatic layout can later accept upgraded batching or stacking stations as output requirements grow. Installation support includes operator training on your site, so the crew understands cycle matching from the first shift.

Documentation & Verification

  • Line layout drawing showing mixer placement, press travel path, and curing zone dimensions for the QMR4-45
  • Capacity calculation sheet stating the exact block format and cycle time assumed for the daily output figure
  • Voltage and frequency confirmation record matching the QMR4-45 control panel to your site supply before dispatch
  • Factory test record showing the machine running with your specified mould installed
  • Hydraulic and electrical schematic for the QMR4-45 diesel and electric configurations

Installation, Commissioning & Support

  • Ground surface must be level and compacted before the QMR4-45 begins egg laying production
  • Electrical connection requires a dedicated circuit matching the confirmed 220V or 380V supply rating
  • Diesel engine option requires on-site fuel supply and exhaust clearance per the 6-8 HP specification
  • First commissioning includes cycle timing verification between the QMR4-45 and the connected mixer
  • Operator training covers mould change procedure across hollow block and paving brick formats
  • Wear parts list supplied with the QMR4-45 identifies replacement hydraulic seals and mould liners

Before You Request a Quote

Tell us the block formats you need to produce and the daily volume your project demands, stated per format rather than as a single total. Share the raw materials available locally — sand type, aggregate grading, and cement specification — so the mixer and mix design can be matched to the QMR4-45 cycle. Confirm whether your site has stable grid power at the required voltage or if the diesel engine configuration is needed for off-grid operation.

Frequently Asked Questions

Q: How do I size the mixer to keep the QMR4-45 running without idle time between cycles?
A: The mixer must deliver a full batch within the 40-45 second moulding cycle, including loading, mixing, and discharge. A pan mixer rated for the volume of one mould charge plus a margin for loading delay is the typical pairing. We confirm mixer capacity against the specific block format and mix design you plan to run before finalizing the line layout.

Q: What ground preparation is needed for egg laying operation on a temporary site?
A: The surface must be level, compacted, and firm enough to support block weight without settling. A thin sand bed or a steel-troweled concrete strip is common. Curing logistics — covering, watering, and space for the blocks to remain undisturbed — must be planned before the QMR4-45 begins laying, since blocks cannot be moved until initial set is reached.

Q: Can I add automatic batching or stacking to this semi-automatic line later?
A: Yes. The semi-automatic configuration leaves room to integrate an automatic batching station upstream or a stacking system downstream as your output requirements grow. We plan the initial line layout with these connection points in mind so that future upgrades do not require relocating the QMR4-45 or redesigning the floor space.

Q: Which supporting equipment must I source locally versus what comes with the machine?
A: The QMR4-45 press and moulds ship complete. Mixers, water tanks, and ground preparation materials are typically sourced locally to reduce shipping volume. We specify the mixer type and capacity required and confirm water supply volume per shift so your local procurement matches the press cycle without overspending on oversized equipment.

Q: How do I plan the line layout on a construction site without a fixed production floor?
A: We provide a layout drawing showing the mixer position, press travel path, and curing zone sized for your target output. The QMR4-45 needs a flat travel surface and adjacent curing area. Because no pallet return loop is required, the total footprint is smaller than a fixed-plant layout, making it practical for constrained job sites.

Get Your Best Price

Inquire About QMR4-45 Mobile Block Machine for Hollow Block – Production Line

Fill in your requirements and our sales engineers will reply with a tailored factory-direct quote within 24 hours.

Product Inquiry
QMR4-45 Mobile Block Machine for Hollow Block – Production Line
24H REPLY
Submitting your inquiry...

★ Factory direct · 24h response · 108+ countries served · CE/ISO certified

Ready to get the best factory price?
46,000m² factory · 320+ engineers · Ships to 108+ countries